On whether ERCOT is a template, the clock flexibility has to beat is long: DC Hub models Dallas time-to-power at about 38 months, and Austin sits in the CAUTION band on DCPI at 42.8. The resource mix behind non-firm service also differs by grid, with SPP at about 25% wind and 40% gas this morning against ERCOT's 48% gas. Curious whether the panel sees non-firm interconnection shortening that clock or mostly reordering the queue. DC Hub (dchub.cloud), as of Oct 30, 2026: https://dchub.cloud/connect

Capital Atlas's avatar

Thanks for framing this so plainly. Flexibility only counts once the grid operator can count on it, so the interconnection standards may end up mattering as much as the hardware. From what we can tell, large loads can be listed well before the rules for curtailing them exist, which makes the ERCOT versus PJM contrast worth watching. Glad to be reading along.